Chattahoochee River WatchChattahoochee River below Buford Dam
--SCORE
Loading gauges…
Pulling live USGS readings.
Buford Dam release timeline
–
Best times to launch
Last 48 hours
Medlock stage (ft)Dam outflow (cfs)Turbidity (FNU)E. coli est. (/100 mL), thin line = 235 limit
Trout this month
How a release plays out
| When | What you see at the ramp |
|---|
Measured from about 45 releases, Sept 17 to Nov 16 2026, at USGS gauges at the dam (02334430), below the dam near GA 20 (02334500), above McGinnis Ferry (02334653), and Medlock (02335000). Settles Bridge, McGinnis Ferry and Abbotts Bridge are interpolated by river distance. Clarity, E. coli and temperature are measured only at Medlock.
Data: USGS gauges 02335000 Norcross/Medlock, 02334430 Buford Dam, 02334653 Settles Bridge. E. coli is the USGS BacteriALERT estimate from turbidity, not a lab count. Planned release schedule: call the Corps at 770-945-1466 or 855-326-3569. Releases can start without warning. Check GA DNR for current regulations.